Bulk Sewer to Southern Paarl: Phase 1

Construction of a 1650 mm, 1200 mm and 1050 mm diameter reinforced concrete HDPE lined bulk sewer pipeline (approximately 2500 m length) at depths of up to 8 m, including manhole and diversion structures.
Construction of the sewer entailed pipeline route through built up areas with existing services as constraints. Lyners was responsible for preliminary design, detail design and tender documentation and construction contract administration.

Project number: 0714
Client: Drakenstein Municipality
Period: 2008-2012
Project value: R37m